Case Study

Carlton Lodge, Belgravia SW1X

A high-spec penthouse duplex transformation in a listed urban context: full internal rebuild, roof reconstruction with structural steel, new services and premium fit-out for multi-unit handover.

Programme11 Months
Budget Band£1.9M – £2.4M
ContextGrade II Listed Setting
DeliveredDuplex + 4 Apartments

Penthouse Duplex in a Listed Setting

Carlton Lodge occupies a prime Belgravia position within a Grade II listed building envelope. The brief was ambitious: transform the underperforming top two floors into a premium duplex penthouse while simultaneously refurbishing four adjacent apartments — all without compromising the listed building fabric or disrupting the occupied units below.

The most significant intervention was a complete roof reconstruction using structural steel to create the headroom and spatial quality expected at this price point. New steel portal frames were craned into position during carefully coordinated weekend lifts, with the existing roof structure stripped back to facilitate the new geometry while maintaining the external roofline profile required by the listing.

The interior design programme demanded the highest specification throughout: engineered oak flooring, natural stone bathrooms, bespoke kitchen cabinetry with integrated Gaggenau appliances, and a full smart home system. Every material selection was made to reflect the Belgravia standard while delivering contemporary living for the international buyer market.

Quality control across five overlapping apartment scopes required dedicated site management and a rigorous inspection regime. The staged handover programme ensured each unit was completed to snagging standard before the next was released, minimising defects and maintaining the premium quality expected at this level.

7-Stage Project Timeline

From listed building coordination through to staged handover, every phase of this 11-month programme was managed to the highest Belgravia standards.

1
Weeks 1–3

Initial Brief & Site Survey

Detailed assessment of the existing penthouse layout and roof structure within the listed building context. Our survey identified the structural constraints of the existing timber roof and mapped party wall conditions with adjoining properties. The client’s brief centred on creating a flagship duplex with four additional apartments for the investor portfolio.

Listed building condition survey Structural roof assessment Services infrastructure audit
2
Weeks 4–7

Concept Design

Two concept schemes were developed for the duplex layout, exploring different approaches to the internal staircase positioning and the relationship between the principal entertaining floor and the upper bedroom level. The selected scheme placed a dramatic double-height void at the heart of the duplex with a feature staircase in bronze and glass.

2 duplex layout options Material palette selection Apartment layout planning
3
Weeks 8–12

Planning & Approvals

Listed building consent coordination required close engagement with the Westminster conservation officer. A heritage impact assessment demonstrated that the roof reconstruction would maintain the external profile while significantly improving the internal spatial quality. The application was supported by detailed visualisations showing the before-and-after roofline from key viewpoints.

Listed building consent Heritage impact assessment Westminster conservation approval
4
Weeks 13–16

Technical Design

The structural steel package was designed in detail, with connection drawings for every node point and a sequenced erection methodology that minimised the period the building was open to weather. M&E design addressed the challenge of routing new services through a listed building without damaging original fabric, using concealed bulkheads and raised floor zones.

Steel connection drawings M&E routing strategy Building regs submission Contractor tender & award
5
Months 5–7

Construction & Structure

Strip-out proceeded carefully under archaeological watching brief conditions required by the listing. The steel package was craned in during two weekend operations, with the new portal frames bolted into position before the temporary weatherproofing was removed. Demolition of the existing internal layouts across all five units ran in parallel once the structural frame was secured.

Controlled strip-out Weekend steel crane lifts Roof reconstruction Quality inspections
6
Months 8–10

Fit-Out & Finishing

The duplex fit-out demanded exceptional craftsmanship: the bronze-and-glass staircase was fabricated off-site and installed in three sections, engineered oak flooring was laid throughout, and natural stone was fitted in all five bathrooms. Each apartment received its own bespoke kitchen and the smart home system was commissioned across all units simultaneously.

Bespoke staircase installation Natural stone bathrooms Gaggenau kitchen fit-out Smart home commissioning
7
Month 11

Handover & Aftercare

A staged handover programme released units sequentially: the four apartments were completed first, followed by the flagship duplex. Each unit underwent independent snagging by the client’s representative, a professional deep clean, and formal handover with all compliance documentation, EPC certificates, and warranty packs. Our 12-month aftercare programme covers all five units.

Staged unit-by-unit handover Independent snagging EPC & compliance packs 12-month aftercare

What We Delivered

Penthouse Duplex Conversion

Complete strip-out and reconfiguration of the top two floors into a premium duplex with double-height void, feature staircase and panoramic terrace access.

Structural Roof Rebuild

Full roof reconstruction with structural steel portal frames to create the headroom and daylight required for premium penthouse living, maintaining the listed external profile.

4 Apartment Refurbishments

Simultaneous refurbishment of four adjacent apartments with new kitchens, bathrooms, flooring and bespoke joinery packages to investment-grade specification.

Full Services Renewal

Complete electrical and plumbing renewal with updated compliance strategy, smart home integration and concealed services routing through the listed building fabric.

Investment Breakdown

How the £1.9M–£2.4M budget was allocated across the major work packages.

Structure & Envelope~36%
Interior Fit-Out & Bespoke Joinery~32%
M&E & Compliance Systems~23%
Professional Fees, Prelims & Contingency~9%

Problems We Solved

Challenge

Listed Building Constraints

Working within a Grade II listed envelope where every intervention required conservation officer approval and original fabric preservation.

Solution

Engaged heritage consultant from day one. Archaeological watching brief during strip-out. All interventions designed to be reversible where required by the listing.

Challenge

Structural Steel in a Live Building

Craning structural steel into a residential building in central Belgravia with occupied units below and restricted road access.

Solution

Weekend crane operations with advance resident notification. Steel delivered in manageable sections with bolted connections to minimise on-site welding noise.

Challenge

Premium Finish Quality

Integrating premium finishes with services routes and structural constraints across five overlapping apartment scopes.

Solution

Dedicated fit-out manager for each unit with daily quality inspections. Mock-up rooms approved before full installation. Concealed services zones designed into every layout.

Challenge

Multi-Unit Coordination

Delivering quality control across the duplex and four apartments simultaneously without trades interfering across units.

Solution

Staggered fit-out programme with dedicated trade teams for each unit. Staged handover ensured each apartment met snagging standard before the next was released.

The quality of the penthouse exceeded our expectations at every level. From the structural ambition of the roof reconstruction to the precision of the joinery and stone work, Hampstead Renovations delivered a Belgravia-standard result that positions these units at the very top of the market.
Richard M.Property Owner, Carlton Lodge, Belgravia

Planning a Similar Project?

Whether you are considering a penthouse conversion, listed building refurbishment or multi-unit development in Central London, our team can help.

Chat with us! Call 020 8054 8756